MYR Group, Inc.
As of Oct 22, 2026, MYR Group is in Stage 4, the downtrend phase, now in week 5 (since Sep 22, 2026). It closed at $254.97, 49.1% below its 52-week high and below its 200-day average, which is rising.
MYR Group Inc., through its subsidiaries, provides electrical construction services in the United States and Canada. More about the company
Pro read
ProOur read
Setup score
Momentum
Edge
Is MYRG early, or has it already run? Pro answers that for every US stock we cover, after every close.
Renews monthly until you cancel. Cancel any time in Plan & billing.
MYRG among Engineering & Construction7th of 52 by relative strength
All 52 →| # | Stock | Stage | RS | 1M |
|---|---|---|---|---|
| 1 | MAGH | Stage 4 · wk 5 | 99 | 0.0% |
| 2 | FIX | Stage 3 · wk 13 | 88 | −21.3% |
| 3 | ACA | Stage 2 · wk 23 | 88 | +1.8% |
| 4 | BBCP | Stage 3 · wk 8 | 83 | −3.4% |
| 5 | CDLR | Stage 4 · wk 1 | 77 | +1.5% |
| 6 | PWR | Stage 2 · wk 3 | 74 | −13.0% |
| 7 | MYRG | Stage 4 · wk 5 | 71 | −13.6% |
| 8 | AGX | Stage 4 · wk 5 | 69 | −11.6% |
MYR Group: quick answers
What stage is MYR Group in?
As of Oct 22, 2026, MYR Group (MYRG) is in Stage 4, the downtrend phase. It entered Stage 4 on Sep 22, 2026 and is in week 5. What the four stages mean
Is MYR Group in an uptrend?
No. MYR Group is in a Stage 4 downtrend. It trades 23.7% below its 200-day average, which is rising.
How far is MYR Group from its 52-week high?
MYR Group closed at $254.97 on Oct 22, 2026, 49.1% below its 52-week high of $501.13. Its 52-week low is $197.12.
How has MYR Group performed over the past year?
As of Oct 22, 2026, MYR Group is up 22.0% over the past year and up 12.5% so far in 2026.
Which sector and industry is MYR Group in?
MYR Group is in the Engineering & Construction industry, part of the Industrials sector.
About this companyIndustrials· Engineering & Construction
MYR Group Inc., through its subsidiaries, provides electrical construction services in the United States and Canada. The company operates through two segments: Transmission and Distribution, and Commercial and Industrial. Its Transmission and Distribution segment offers a range of services on electric transmission and distribution networks, and substation facilities, including design, engineering, procurement, construction, upgrade, maintenance, and repair services with primary focus on construction, maintenance, and repair to customers in the electric utility industry; and services, including construction and maintenance of high voltage transmission lines, substations, and lower voltage underground and overhead distribution systems, clean energy projects, and electric vehicle charging infrastructure services, as well as emergency restoration services in response to hurricane, wildfire, ice storm, or other related damages. This segment serves as prime contractor to customers, such as investor-owned utilities, cooperatives, private developers, government-funded utilities, independent power producers, independent transmission companies, industrial facility owners, and other contractors. The Commercial and Industrial segment provides a range of services, including design, installation, maintenance, and repair of commercial and industrial wiring; and installation of intelligent transportation systems, roadway lighting, and signalization for airports, hospitals, data centers, hotels, stadiums, commercial and industrial facilities, clean energy projects, manufacturing plants, processing facilities, water/waste-water treatment facilities, mining facilities, intelligent transportation systems, roadway lighting, signalization, and electric vehicle charging infrastructure. This segment serves general contractors, commercial and industrial facility owners, governmental agencies, and developers. MYR Group Inc. was founded in 1891 and is headquartered in Thornton, Colorado.
Visit company website →All analytics based on EOD data. Data as of 2026-10-22. Past data patterns are not indicative of future results. This page is a data analytics tool only.